Evaluating the existing barriers in implementing constructability

Jadidoleslami, Samereh and Saghatforoush, Ehsan and Heravi, Amirhossein and Preece, Christopher (2018) Evaluating the existing barriers in implementing constructability. Civil Engineering Journal, 4 (12). pp. 2864-2875. ISSN 2676-6957

[img]
Preview
Text (Published Version)
Evaluating the Existing Barriers in Implementing Constructability.pdf
Available under License Creative Commons Attribution 4.0.

Download (811kB) | Preview

Abstract

In fact, constructability is facilitating the construction of a project through integrating knowledge and experience to achieve the overall and common objectives of the project in all stages of it, but practically there is still a significant gap between design, construction, and achieving the desired project objectives. Studies show that separating the design and construction processes and lack of presence of the contractor in the design stage, prevent the effective use of experiences and specialty of the contractor to improve and develop design processes. This issue results in increasing project time and cost, poor relationships, and also increasing project waste and duplication. The barriers to implementing this concept can have major differences with each other in different locations all over the world, due to the unity of the executive conditions in various countries. This paper evaluates the existing practical barriers to implementation of constructability in the construction industry. A comprehensive literature review has been performed by the authors through using the Meta-Synthesis method and findings were used to form research assumptions. Three case studies of Mass Housing project (MHP) in Tehran were instigated. Outputs taken from nine interviews with different experts in this industry working in diverse areas, including owners, consultants and contractors are then ranked after theoretical saturation compared using the NVIVO Software and through pattern and descriptive analyses. The concept of constructability is focused on the early presence of contractors in the initial stages of the project. So that, through integrating knowledge and experience, problems due to lack of their presence in the early stages of the project can be reduced. Comparing the existing barriers to implementing constructability in Iran with those of the wider world, presents some effective solutions to facilitate the presence of the construction contractors in the early stages of projects.


Statistics for USQ ePrint 43510
Statistics for this ePrint Item
Item Type: Article (Commonwealth Reporting Category C)
Refereed: Yes
Item Status: Live Archive
Additional Information: This is an open access article under the CC-BY license (https://creativecommons.org/licenses/by/4.0/).
Faculty/School / Institute/Centre: Current - Faculty of Health, Engineering and Sciences - School of Civil Engineering and Surveying (1 Jul 2013 -)
Faculty/School / Institute/Centre: Current - Faculty of Health, Engineering and Sciences - School of Civil Engineering and Surveying (1 Jul 2013 -)
Date Deposited: 09 Sep 2021 02:49
Last Modified: 09 Sep 2021 04:13
Uncontrolled Keywords: constructability; analytic comparison; constructability barriers; integration; mass projects; construction contractors
Fields of Research (2008): 12 Built Environment and Design > 1202 Building > 120201 Building Construction Management and Project Planning
Fields of Research (2020): 33 BUILT ENVIRONMENT AND DESIGN > 3302 Building > 330202 Building construction management and project planning
Identification Number or DOI: doi:10.28991/cej-03091204
URI: http://eprints.usq.edu.au/id/eprint/43510

Actions (login required)

View Item Archive Repository Staff Only