Browse by Fields of Research (ANZSRC 2008)

Up a level
Export as [feed] RSS 1.0 [feed] RSS 2.0
Number of items at this level: 91.

Ferdous, Wahid and Manalo, Allan (2014) Failures of mainline railway sleepers and suggested remedies – review of current practice. Engineering Failure Analysis, 44. pp. 17-35. ISSN 1350-6307

Ferdous, Wahid and Manalo, Allan and Aravinthan, Thiru and Remennikov, Alex (2014) Review of failures of railway sleepers and its consequences. In: 1st International Conference on Infrastructure Failures and Consequences (ICFC 2014), 16-20 Jul 2014, Melbourne, Australia.

Manalo, A. C. and Aravinthan, T. and Karunasena, W. (2013) Analysis of a railway turnout system with a spot replacement sleeper. In: 22nd Australasian Conference on the Mechanics of Structures and Materials (ACMSM 22): From Materials to Structures: Advancement Through Innovation, 11-14 Dec 2012, Sydney, Australia.

Freeman, Bryan (2013) A preliminary feasibility study for transporting Surat Basin export coal using Maglev technology. [USQ Project] (Unpublished)

Bowles, Yvonne Elizabeth (2013) A consistent approach to headlight screens in NSW. [USQ Project] (Unpublished)

Reynolds, Peter William (2013) Engineering correlations for the characterisation of reactive soil behaviour for use in road design. [USQ Project] (Unpublished)

Dann, William (2013) Investigation into traffic controller health and safety at road works in Queensland. [USQ Project] (Unpublished)

Langes, Chris (2013) Investigation of shunt vehicle derailments. [USQ Project] (Unpublished)

Hartwig, Andrew (2013) Management of low traffic volume roads unsealed road classification system. [USQ Project] (Unpublished)

Spilsbury-Brinkmann, Casey (2013) The economic feasibility of upgrading Moree’s light industrial area to legally cater for restricted access vehicles. [USQ Project] (Unpublished)

Spurling, Harrison (2013) Water sensitive urban design for sustainable road development. [USQ Project] (Unpublished)

Thorpe, David (2013) Evaluating factors in sustainable road construction and management: a life cycle approach. Working Paper. University of Southern Queensland, Australian Centre for Sustainable Business and Development, Brisbane, Australia.

Zheng, Kan and Liu, Fei and Zheng, Qiang and Xiang, Wei and Wang, Wenbo (2013) A graph-based cooperative scheduling scheme for vehicular networks. IEEE Transactions on Vehicular Technology , 62 (4). pp. 1450-1458. ISSN 0018-9545

Whittaker, Adam and Somasundaraswaran, Kathirgamalingam (2013) The safety benefit of wide centerline treatments utilizing audio-tactile line-marking on undivided highways. In: 14th Road Engineering Association of Asia and Australasia Conference (REAAA 2013): The Road Factor in Economic Transformation , 26-28 Mar 2013, Kuala Lumpur, Malaysia.

Al-Nuaimi, Hamdi and Ayers, Ron and Somasundaraswaran, Kathirgamalingam (2013) Traffic flow modelling for an urban arterial road in Brisbane City. In: 14th Road Engineering Association of Asia and Australasia Conference (REAAA 2013): The Road Factor in Economic Transformation, 26-28 Mar 2013 , Kuala Lumpur, Malaysia.

Shiau, Jim (2013) Shakedown analysis of layered continuum. In: 1st Australasia and South East Asia Conference in Structural Engineering and Construction (ASEA-SEC-1), 28 Nov-2 Dec 2012, Perth, Australia.

Al-Nuaimi, Hamdi and Ayers, Ron and Somasundaraswaran, Kathirgamalingam (2012) The effectiveness of using variable speed limit on the performance of an interrupted flow. In: IASTED International Conference on Engineering and Applied Science (EAS 2012): Applications for the 21st Century , 27-29 Dec 2012, Colombo, Sri Lanka.

Smith, Scott David (2012) Determination of a strategic planning approach for maintenance management of a major road network. [USQ Project] (Unpublished)

Taylor, Jarrod Lee (2012) Evaluation of the capacity of signalised two lane roundabouts. [USQ Project] (Unpublished)

Whittaker, Adam (2012) The safety benefit of continuous narrow painted median strips. [USQ Project] (Unpublished)

Thorpe, David (2012) Evaluating factors in sustainable road construction and management: a life cycle approach. In: 28th Annual Association of Researchers in Construction Management Conference (ARCOM 2012), 3-5 Sep 2012, Edinburgh, Scotland.

Keys, Jason and Ayers, Ron (2012) The effects of improved vehicle technology on the design of acceleration and deceleration lanes at freeway entry and exit ramps. In: 25th Australian Road Research Board Conference: Shaping the Future: Linking Policy, Rresearch and Outcomes (ARRB 2012) , 23-26 Sep 2012, Perth, Australia.

Manalo, Allan and Aravinthan, Thiru and Karunasena, Warna and Stevens, Nick (2012) Analysis of a typical railway turnout sleeper system using grillage beam analogy. Finite Elements in Analysis and Design, 48 (1). 1376-1391 . ISSN 0168-874X

Olm, David William Charles (2011) Management of road reconstruction and repair following a flooding disaster. [USQ Project] (Unpublished)

Fichera, Anthony (2011) A practical comparison of VISSIM and SIDRA for the assessment of development impacts. [USQ Project] (Unpublished)

Randall, Neil William (2011) A preliminary analysis of the effectiveness of the new QLD GDL program. [USQ Project] (Unpublished)

Keleher, Matthew (2011) Analysis of high-speed rural traffic crashes within the South-West district of Toowoomba regional council. [USQ Project] (Unpublished)

Wilson, Paul (2011) Effectiveness of lime stabilisation on reactive soils for main roads. [USQ Project] (Unpublished)

Zeller, Karl (2011) Evaluation of the operational characteristics of heavy vehicles at signalised intersections in Queensland. [USQ Project] (Unpublished)

Meredith, Tyronne (2011) Options for the replacement of aging bridges under local authority control in rural areas of Queensland. [USQ Project] (Unpublished)

Yin, Matthew (2011) Using local gravel sources and granular stabilisation for the production of pavement gravels in the Toowoomba region. [USQ Project] (Unpublished)

Fitzgerald, Danial (2011) Managing the repair of transport infrastructure after a natural disaster. [USQ Project] (Unpublished)

Brodie, Ian M. and Egodawatta, Prasanna (2011) Relationships between rainfall intensity, duration and suspended particle washoff from an urban road surface. Hydrology Research: an International Journal, 42 (4). pp. 239-249. ISSN 1998-9563

Somasundaraswaran, Kathirgamalingam (2010) The road safety: a special sign for unfamiliar drivers. In: 2010 Southern Region Engineering Conference (SREC 2010), 11-12 Nov 2010, Toowoomba, Australia.

Stanton, Dale John (2010) Atterberg limits and their relationship to longitudinal cracking in granular pavements. [USQ Project] (Unpublished)

Martin, Joseph A. (2010) Driving problems encountered in the UAE by newly arrived expatriates and tourists. [USQ Project] (Unpublished)

Caunce, Catherine May (2010) Effective road pavement design for expansive soils in Ipswich. [USQ Project] (Unpublished)

Hanson, Scott (2010) Improvement and performance of pavement gravels used by Toowoomba Regional Council for unsealed roads. [USQ Project] (Unpublished)

Zanetti, Ashley (2010) Investigation of pavement design for low volume rural roads. [USQ Project] (Unpublished)

Somasundaraswaran, Kathirgamalingam and Bullen, Frank and Ayers, Ron (2010) The use of road safety target setting in fatality and injury reduction. In: 24th Australian Road Research Board Conference (ARRB 2010) , 12-15 Oct 2010, Melbourne, Australia.

Langdon, Aaron G. (2009) Traffic induced moisture entry into road pavements. [USQ Project] (Unpublished)

Crone, Jeffrey John (2009) Alternate pavement types on reactive soils in the Ipswich Council area. [USQ Project] (Unpublished)

Porter, Hannah Elizabeth (2009) Involvement of older drivers at crashes at unsignalised and signalised intersections. [USQ Project] (Unpublished)

Armstrong, Andrew Jonathan (2009) Sealing works performance study. [USQ Project] (Unpublished)

Baker, Philip James (2009) The 50 kph speed limit in residential Toowoomba. [USQ Project] (Unpublished)

Shann, Blaise N. (2008) Variable rate bitumen spraying in road construction and resurfacing. [USQ Project] (Unpublished)

Taylor, Timothy Noel (2008) Rural arterial road operating speed assessment. [USQ Project] (Unpublished)

Goodall, Joshua Edward Allan (2008) The effect of the 50km/h implementation on local streets in Toowoomba. [USQ Project] (Unpublished)

Adams, Nicholas John (2008) The pedestrianisation of inner city Toowoomba. [USQ Project] (Unpublished)

Ole, Zayne Kristian (2008) Track stability and buckling - rail stress management. [USQ Project] (Unpublished)

Somasundaraswaran, A. K. (2008) Results of surveys among drivers and customers of for-hire three-wheelers in five small towns in Sri Lanka. Asia Pacific Development Journal, 15 (1). pp. 119-135. ISSN 1020-1246

O'May, David Victor (2007) A study of pavement performance on the Gatton Bypass Duplication. [USQ Project] (Unpublished)

Gallagher, Tony (2007) Clear zones in urban environments. [USQ Project] (Unpublished)

Weis, Paul Raymond (2007) Cost effectiveness of street lighting. [USQ Project] (Unpublished)

Liyanawaduge, Nawanandana Chandrasiri (2007) GPS usage and infrastructure needs for machine guidance and control in the construction projects associated with QDMR. [USQ Project] (Unpublished)

Crowe, Daniel Leigh (2007) Management of physical assets at Purga Quarry. [USQ Project] (Unpublished)

Dugdell, David Thomas (2007) Toowoomba road network review. [USQ Project] (Unpublished)

Harvey, Warren John (2007) Bridge approach guardrail prioritisation. [USQ Project] (Unpublished)

Johnston, George Finlay (2007) Wildlife vehicle collision GIS mapping & modelling. [USQ Project] (Unpublished)

Weatherley, Mark Geoffrey (2007) The effect of compaction on the design life of rehabilitated insitu cement powder stabilised pavements. [USQ Project] (Unpublished)

McGrath, Stephen K. (2007) Integrating project, program, portfolio, asset and corporate management. In: 4th Annual Project Management Australia Conference (PMOz 2007): Creating Success, 28-31 Aug 2007, Gold Coast, Australia.

McGrath, Steve (2007) Using strategic asset management as an infrastructure strategy tool. In: Public Infrastructure and Asset Management Conference (IIR 2007), 28-30 May 2007, Sydney, Australia.

McGrath, Steve (2006) Lifecycle project management. In: Project Management Strategies for Team Leaders and Managers in the Public Sector 2006, 6-7 Dec 2006, Kuala Lumpur, Malaysia.

Sharp, Clayton Anthony (2006) Investigation of Toowoomba intersection crashes. [USQ Project] (Unpublished)

Hughes, Neil (2006) Accuracy of volumes from MX(moss) design software. [USQ Project] (Unpublished)

Govender, Gansen (2006) Driver fatigue issues on State Highway 1 south of Whangarei - within region 1 of New Zealand. [USQ Project] (Unpublished)

Bartlett, Jeremy Adam (2006) Establishment of a priority infrastructure plan for the major road network in Laidley Shire. [USQ Project] (Unpublished)

Tierney, Daniel Robert (2006) Freight transport following an extreme rainfall event. [USQ Project] (Unpublished)

Allen, Glen Keith (2006) Problems of stone mastic asphalt use in north Queensland. [USQ Project] (Unpublished)

Luke, Ricky (2006) Cost effectiveness of suburban street lighting. [USQ Project] (Unpublished)

Anderson, Troy and Ayers, Ron (2006) Prioritisation of guardrail remedial works. In: 22nd ARRB Conference: Research Into Practice, 29 Oct - 02 Nov 2006, Canberra, Australia.

Tucker, Neil John (2006) Evaluation of the Queensland streets concept in residential streets in Logan City. [USQ Project] (Unpublished)

Somasundaraswaran, Kathirgamalingam (2006) Accident statistics in Sri Lanka. IATSS Research, 30 (1). pp. 115-117. ISSN 0386-1112

Kannapiran, Ram Kumar M. (2005) A study and evaluation on SMART Project, Malaysia. [USQ Project] (Unpublished)

Harber, Paul James (2005) Applicability of no-fines concrete as a road pavement. [USQ Project] (Unpublished)

Outschoorn, Jeremy Paul (2005) Computational fluid mechanics investigation of ventilation aboard a livestock vessel. [USQ Project] (Unpublished)

Domrow, Ryan (2005) Development of a mechanical testing system to investigate road deformation. [USQ Project] (Unpublished)

Anderson, Troy Dennis (2005) Prioritisation of guard rail remediation works. [USQ Project] (Unpublished)

Wong, Alan (2005) Using GIS to explore the relationship between road grade and accidents. [USQ Project] (Unpublished)

McGrath, S. K. (2005) OnQ - a journey through project, program and portfolio methodology. In: 2nd Annual Project Management Australia Conference (PMOz 2005): Projects: Making it Happen, 30 Aug-2 Sep 2005, Brisbane, Australia.

Leong, Weng Wah (2005) The impact of trenching on urban road operation and maintenance. [USQ Project] (Unpublished)

Chen, G. and Baker, Graham (2004) An analytical model for predication of crack spacing due to shrinkage in concrete pavements. Journal of Structural Engineering, 130 (10). pp. 1529-1533. ISSN 0733-9445

Mackenzie, Christopher Frank (2004) Evaluation of funding justification of low volume roads in North Queensland. [USQ Project] (Unpublished)

Jensen, Jason W. (2004) Influence of physical road characteristics on road crashes. [USQ Project] (Unpublished)

Li, David (2004) Investigation of driver fatigue problems on the Oakey-Cooyar road. [USQ Project] (Unpublished)

Underhill, Richard (2004) Life cycle maintenance of low volume roads in the Alice Springs region. [USQ Project] (Unpublished)

Tan, Kok Wei (2004) Motorcycle safety in Malaysia. [USQ Project] (Unpublished)

Gitau, Samuel Kimani (2004) Use of road asset maintenance planning software in QDMR. [USQ Project] (Unpublished)

McGrath, Steve (2003) Changing culture in a government department. In: 3rd World Project Management Week Conference 2003, 24-28 Mar 2003, Gold Coast, Australia.

Bullen, Frank (2003) Design and construction of low-cost, low-volume roads in Australia. Transportation Research Record: Journal of the Transportation Research Board, 1819 . pp. 173-179. ISSN 0361-1981

Thorpe, David (2003) Online remote construction management trials in Queensland Department of Main Roads: a participant's perspective. Construction Innovation: Information, Process, Management, 3 (2). pp. 65-79. ISSN 1471-4175

This list was generated on Fri Oct 24 19:41:26 2014 EST.