Lau, Chau Chin (2004) A study on concrete faced rockfill dams. [USQ Project] (Unpublished)
Metadata
| HTML Citation | EndNote | Dublin Core | Reference Manager |
Full text available as:
| PDF - Requires a PDF viewer such as GSview, Xpdf or Adobe Acrobat Reader 8Mb |
Abstract
Concrete faced rockfill dams (CFRD) have been widely used for multi-purposes over the world. The construction of CFRD involves placing the higher-grade rock at the dam core, and compacting them to their maximum strength. A reinforced concrete slab is then constructed at the upstream face of the dam. The concrete face will transfer the water pressure to the rocks and finally to the dam foundation. First part of the project is a comprehensive study involved detail studying of CFRD project before a new project can be initiated. The research covers the literature review, geological investigation, civil and structural design principal, construction method and structural behavior. The second part is a case study of Bakun Dam project in Malaysia. Based on the findings, the potential of Bakun Dam in Malaysia is reviewed.
| Item Type: | USQ Project |
|---|---|
| Uncontrolled Keywords: | concrete faced rockfill dams (CFRD), Bakun Dam project |
| Fields of Research (FOR2008): | 09 Engineering > 0905 Civil Engineering > 090502 Construction Engineering 09 Engineering > 0905 Civil Engineering > 090506 Structural Engineering 09 Engineering > 0905 Civil Engineering > 090509 Water Resources Engineering |
| Subjects: | 290000 Engineering and Technology > 290800 Civil Engineering > 290804 Construction Engineering 290000 Engineering and Technology > 290800 Civil Engineering > 290802 Water and Sanitary Engineering |
| Socio-Economic Objective (SEO2008): | UNSPECIFIED |
| ID Code: | 97 |
| Deposited By: | |
| Deposited On: | 11 Oct 2007 10:14 |
| Last Modified: | 26 Feb 2009 13:15 |
Archive Staff Only: edit this record