A study on concrete faced rockfill dams

Lau, Chau Chin (2004) A study on concrete faced rockfill dams. [USQ Project] (Unpublished)

Metadata

HTML CitationEndNoteDublin CoreReference Manager

Full text available as:

[img]
Preview
PDF - Requires a PDF viewer such as GSview, Xpdf or Adobe Acrobat Reader
8Mb

Abstract

Concrete faced rockfill dams (CFRD) have been widely used for multi-purposes over the world. The construction of CFRD involves placing the higher-grade rock at the dam core, and compacting them to their maximum strength. A reinforced concrete slab is then constructed at the upstream face of the dam. The concrete face will transfer the water pressure to the rocks and finally to the dam foundation. First part of the project is a comprehensive study involved detail studying of CFRD project before a new project can be initiated. The research covers the literature review, geological investigation, civil and structural design principal, construction method and structural behavior. The second part is a case study of Bakun Dam project in Malaysia. Based on the findings, the potential of Bakun Dam in Malaysia is reviewed.

Item Type:USQ Project
Uncontrolled Keywords:concrete faced rockfill dams (CFRD), Bakun Dam project
Fields of Research (FOR2008):09 Engineering > 0905 Civil Engineering > 090502 Construction Engineering
09 Engineering > 0905 Civil Engineering > 090506 Structural Engineering
09 Engineering > 0905 Civil Engineering > 090509 Water Resources Engineering
Subjects:290000 Engineering and Technology > 290800 Civil Engineering > 290804 Construction Engineering
290000 Engineering and Technology > 290800 Civil Engineering > 290802 Water and Sanitary Engineering
Socio-Economic Objective (SEO2008):UNSPECIFIED
ID Code:97
Deposited By:
Deposited On:11 Oct 2007 10:14
Last Modified:26 Feb 2009 13:15

Archive Staff Only: edit this record