Millmerran Power Station ROM coal blockage removal system

El Komy, Ahmed (2007) Millmerran Power Station ROM coal blockage removal system. [USQ Project] (Unpublished)

Metadata

HTML CitationEndNoteDublin CoreReference Manager

Full text available as:

[img]
Preview
PDF - Requires a PDF viewer such as GSview, Xpdf or Adobe Acrobat Reader
5Mb

Abstract

[Abstract]: Millmerran Power Station (MPS) consists of two units with each unit producing 420 MW of electricity. The coal is delivered to the plant by off road type trucks and unloaded into a 500 MT hopper. The ROM (run of mine) coal is processed through a series of crushing stations and coal handling (storage/reclaim) systems, and delivered by overland conveyor to the power plant silos. MPS, as a coal fired station, is wholly dependent on a consistent and reliable supply of coal to maintain operating efficiency. MPS has been experiencing inefficiencies in their ROM coal supply because of constant blockage issues at the receiving hopper. This blockage is a direct result of large lumps of coal coming from the mine. The blockages interrupt the supply of coal potentially lowering the fuel supply to the power station. Currently, an excavator is hired to clear up the blockage which could be utilised more effectively elsewhere. This introduces an extra cost to the mine in terms of both money and inefficiency. MPS is seeking an engineering design solution to this problem. The elimination of the blockages through an automatic system without increasing any safety risks is highly desirable as that would result in a cheaper and smoother operation of the mine. A literature review on the current coal handling system of MPS was essential in order to be able to develop a design that is suitable for MPS. In this investigation, five conceptual designs with the most appropriate design, in terms of meeting the specified criteria, was analysed and detailed. It was found that the simpler and more effective the design, the higher its practicality in terms of reaching the desired objectives. This enabled an overall cost estimate budget to be produced, which would be the major deciding factor on the implementation of the design. The results of this investigation will aid in gaining an understanding of the overall general solution for the ROM coal blockage problem at MPS. Both design and engineering solutions have been recommended in this dissertation. This will lead eventually to a more automated, safer, efficient and cost effective operating environment.

Item Type:USQ Project
Uncontrolled Keywords:Millmerran; Queensland; power station; electricity; coal power station; coal; coal handling; ROM; blockage; mine
Fields of Research (FOR2008):09 Engineering > 0914 Resources Engineering and Extractive Metallurgy > 091499 Resources Engineering and Extractive Metallurgy not elsewhere classified
09 Engineering > 0913 Mechanical Engineering > 091399 Mechanical Engineering not elsewhere classified
09 Engineering > 0914 Resources Engineering and Extractive Metallurgy > 091405 Mining Engineering
Subjects:290000 Engineering and Technology > 290500 Mechanical and Industrial Engineering > 290501 Mechanical Engineering
290000 Engineering and Technology > 290700 Resources Engineering > 290799 Resources Engineering not elsewhere classified
Socio-Economic Objective (SEO2008):UNSPECIFIED
ID Code:3993
Deposited By:
Deposited On:12 Mar 2008 16:00
Last Modified:03 Apr 2009 13:00

Archive Staff Only: edit this record