Monetary retentions for subcontract work: a risk-based approach

Abeysekera, Vasantha and Soysa, Mohantha (2012) Monetary retentions for subcontract work: a risk-based approach. In: World Construction Conference 2012: Global Challenges in Constrcution Industry, 28-30 June 2012, Colombo, Sri Lanka.

[img]
Preview
PDF (Accepted Version)
Abeysekera_Soysa_WCC_2012_AV.pdf

Download (719Kb)

Abstract

The subcontracting culture in New Zealand is such that the same retention regime imposed on contractors is imposed on subcontractors by and large. This paradoxically fair contractual practice of back-to-back terms results in high retention rates (10%) and long defects liability periods set from contractor’s practical completion which has caused concerns for subcontractors with no rational basis for resolving such concerns. This study investigates this phenomenon from a risk based perspective to understand the link between risk and retentions particularly in relation to current practice. Accordingly, it is found that current retention rates do not show an association with overall risk computed as a product of likelihood and consequence based on contractors’ perceptions. However, when risk is viewed through these two components, it is seen that trades with high default risks for either likelihood or consequence results in high retention rates. Additionally, it is also seen that high risk is associated with subcontractor-harsh retention regimes with some exceptions lowering the strength of this association suggesting the need to investigate such trades to understand whether there are other overwhelming reasons for such exceptions. Thus, it is concluded that risk and retention regimes are linked to this extent although for a given level of risk, subcontractor friendly or unfriendly regimes could be achieved by a mix of different retention rates and release mechanisms. In this regard, it is seen that contractors seem to prefer high retention rates than longer defects liability periods for trades which have high risk levels. A further understanding about this relationship could be developed by undertaking a study on perceived overall risk levels and perceived retention regimes.


Statistics for USQ ePrint 21419
Statistics for this ePrint Item
Item Type: Conference or Workshop Item (Commonwealth Reporting Category E) (Paper)
Refereed: Yes
Item Status: Live Archive
Additional Information: Published version © Ceylon Institute of Builders - Sri Lanka.
Depositing User: Dr Vasantha Abeysekera
Faculty / Department / School: Historic - Faculty of Engineering and Surveying - Department of Agricultural, Civil and Environmental Engineering
Date Deposited: 17 Jul 2012 02:56
Last Modified: 21 Aug 2014 20:28
Uncontrolled Keywords: contracting culture, defects liability period, retentions, retainage, subcontracting
Fields of Research (FOR2008): 12 Built Environment and Design > 1202 Building > 120201 Building Construction Management and Project Planning
12 Built Environment and Design > 1202 Building > 120299 Building not elsewhere classified
Socio-Economic Objective (SEO2008): B Economic Development > 87 Construction > 8799 Other Construction > 879999 Construction not elsewhere classified
URI: http://eprints.usq.edu.au/id/eprint/21419

Actions (login required)

View Item Archive Repository Staff Only